• v0.5.0 43b5c237d4

    v0.5.0
    All checks were successful
    / secrets-scan (gitleaks 8.28.0, all refs, redacted) (push) Successful in 4s
    / test (linux/amd64, full suite) (push) Successful in 1m9s
    / build linux/amd64 (push) Successful in 48s
    / build darwin/amd64 (push) Successful in 52s
    / build windows/amd64 (push) Successful in 49s
    / build darwin/arm64 (push) Successful in 50s
    / build linux/arm64 (push) Successful in 47s
    / build windows/arm64 (push) Successful in 49s
    / release (six binaries + checksums.txt, tag pushes only) (push) Successful in 55s
    Stable

    assistant released this 2026-11-09 17:49:39 +01:00 | 704 commits to dev since this release

    v0.5.0 — Release record & item priority

    BREAKING — one verb retires, one default moves. release readiness is gone — absorbed by the new release show — and
    scripts calling it exit 2 with a usage error naming the release
    surface's current forms. And the item listings now order
    priority-major (high first, low last): items carry a priority
    ladder as of this round. The store grows three keys, all additive —
    format stays 1 — and the seam runs one way, as ever: a pre-0.5
    binary meeting a file the new binary has written rejects it loud
    (strict decode, unknown key, exit 3, file named). Upgrade machines
    together; there is nothing to re-init.

    Surface ≤ v0.4.x v0.5.0
    skuld release readiness <id> the dashboard query retired — exit 2; skuld release show <id> [--finished]
    item list, ready list — order code order (parents before dotted children) priority-major — high first, low last; ties keep code order
    every item render — carries priority (machine: appended last of the stored fields)
    release publish <id> answer {id, state, created_at} + released_at — and --tag <ref> may ride the same transition

    Upgrading: drop-in for the store — the three keys (priority on
    the item record; released_at and tag on the version record)
    append at the end of their key orders, and a store predating them
    reads clean: absent ≡ never-set — a never-set priority renders
    normal; a scope released before this round shows no timestamp and
    no ref. No backfill: v0.3.0 → v0.4.1 keep git tags as their
    "when" — though their tag refs may still be associated post-hoc
    (release tag); their released_at never (publish is the only
    stamper, and released is terminal). The onboarding templates did not
    move — no bump, nothing to re-init. Scripts: JSON consumers ride the
    additive keys; golden pins and byte-differs move — priority rides
    every item shape, and the listing default order turns
    priority-major.

    What shipped

    • released_at — the ship moment, stamped at publish — the
      release record grows from a bare terminal state to a record:
      publishing stamps the transition moment on the scope, a full UTC
      timestamp of the same class as created_at and distinct from it
      in the publish answer (created_at is the scope's birth, not its
      ship). Surfaces wherever the release record surfaces — release list, release show; the human form may trim to date
      (presentation, not store). Terminal by construction: released is
      terminal, no path rewrites the stamp.
    • The tag association — a released scope carries at most one tag
      ref: a free-form VCS reference, typically the tag name, a commit
      sha as the degenerate case. release publish --tag <ref> sets it
      in the same write as the stamp; release tag <id> <ref> sets or
      replaces it afterwards — this repo's own ceremony (publish, then
      the Principal tags git) lands on the verb. Replaceable: a moved
      tag follows reality; the field holds the current association, not
      a history — history is git's job. The tracker records, never
      verifies: no git call, no ref grammar; hostile refs (HTML-ish,
      long, empty) ride verbatim. A tag mutation on a non-released scope
      exits non-zero with a corrective error naming the state.
    • release show — the one per-scope read — the query the
      release noun lacked (item had show; release had list): the scope
      record — identifier, state, timestamps, plus released_at and the
      tag ref on released scopes when present — together with the
      version's not-done, not-cancelled members grouped open /
      in-progress / blocked, each blocked item with its blocking chain
      (capped at 32, truncation exact). --finished adds done and
      cancelled members; jsonl and human forms, deterministic bytes. It
      absorbs and retires release readiness — the dashboard query
      lives on inside show (VersionReadiness became ShowVersion);
      the verb is gone from surface and help, exit 2 naming the new
      forms, per the house no-alias rule since v0.3.0. The retirement
      sweep moved every living citation — and the reviewer's read-only
      allowlist (skuld release readiness* → skuld release show*)
      with it, else the reviewer would have silently lost its dashboard
      read.
    • The priority ladder — high, normal, low: a closed set like the
      status ladder, project-wide and type-agnostic, canonical
      lowercase. unset ≡ normal — an item that never chose presents
      normal; no signal IS normal. item create --priority (absent =
      normal), item set --priority, item list --priority (comma
      lists); priority renders on every shape that renders an item —
      machine: appended last of the stored fields; human: the tables
      carry the column. Off-ladder values (urgent, 2) exit non-zero
      with a corrective error naming the ladder (E_PRIORITY). Numeric
      rank was rejected at the ruling (2026-11-09): renumbering churn,
      false precision — and it still needs a tie rule. The ladder fills
      the slot parked due-dates leave — a rank relative to other tasks,
      not a deadline.
    • Priority-aware default ordering — item list (every filter
      form) and the ready list order priority-major: high first, low
      last; ties keep the existing deterministic order. The sort is an
      application-layer concern over the code-ordered repo read (the
      repository stays the neutral substrate); grouped views inside
      other reads — release show's member groups, needs/blocks, claims
      — are not work-picking listings and keep their order. Byte
      stability is pinned three ways: same command twice ⇒ identical
      bytes; an all-normal store lists in the order the pre-change
      binary produced (the sort is a no-op); a pre-field store and its
      canonical rewrite-with-key list byte-identically.
    • The store: three additive keys, one corrected row — both
      strands ride the ADR-016 append-at-end seam; format stays 1, old
      files read natively. The merge matrix gains the release-record
      rows: publish/publish conflicts (two publish moments — or two
      refs — is a lie; byte-identical same-second publishes sharing one
      ref collapse clean); tag/tag conflicts on differing refs, clean on
      identical; and publish/tag is conflict — corrected en route
      (architect 706084e, 2026-11-09, after the tester's fixture probe
      contested the row): the tag key sits directly after
      released_at, and git never auto-resolves adjacent changed
      regions — every realizable timeline conflicts; resolution is human
      and trivial (keep the true stamp and one side's ref). One
      carry-through pin from review: a tag set or replace on a released
      scope leaves released_at byte-identical.

    The ceremony, end to end

    Create the scope, assign the items, start it; the round runs against
    the board. release publish stamps the moment — --tag rides the
    same write when the ref is known at publish, else release tag
    follows the git tag. release show is the dashboard while the scope
    lives, and release show <id> --finished reads the round back once
    it ships: record, membership, chains — one hop. This round was
    driven exactly so; this page is its read-back.

    Downloads